This transit oriented community near BART got the fix it needed.

88 king
 
 
 

project specifics

8400 Oceanview Terrace, San Francisco

370 Condominiums Units
100,000 square feet supermarket & retain
7.5 acres site
Construction Cost: Inquire
Occupied Repair
Original Construction: 2002

project team

Owner: Oceanview HOA
Contractor: WE Lyons & AC Enterprises
Consultant: EPIC Scan

 

project scope of work

As the Architect of Record for both the residential and commercial repairs, we design and oversaw construction for plaza deck repair, rusting steel elements, window repair, siding repair, and adding shear walls.

 

LITIGATION & INVESTIGATION

Ferrari Moe was an expert witness during construction litigation. We lead the investigation for finding defects in the building envelope, plaza deck, and structural items.

fell_street_side.jpg
 
 
 

plaza

A large central plaza and podium deck was a major source of water intrusion. Intricate repairs to the membrane had to occur, taking into account the different plaza materials.

 

windows & siding

The project removed or repaired failing windows. As evidenced by the elevation, the siding varies often, so different detailing and repair plans had to be developed for each type.

 
fell_elevation.jpg
 